top of page
glass stairs
black-themed-frameless-glass-pool-fencing (1).jpeg

FAQ

Tempered-Glass-vs-Laminated-Glass.jpeg

Tempered VS Laminated glass

Typical ordering time for laminated glass is 2 weeks. For Tempered 2-3 days.

Base-Shoe-System2-2-1024x691.jpeg

Base shoe system

We work with NOA certified Q rail base shoes system for exterior and interior glass railings

standoff-system

Standoff system

Oasis railing systems use industry standard monolithic or tempered laminated glass.  All system components available in brushed, polished or painted stainless steel or aluminum.  Typical glass sizes 48”– 60” wide. Projects are templated for precise measurement by Oasis Specialty Glass. 

post-system

Post System

Oasis Post & Rail Systems are available in brushed, polished or painted stainless steel, in standard tube sizes from 1.5” to 2” (larger sizes on request). Tube shapes available in standard round or square.

the stair glass company

Stairs treads - top quality

Red oak stair treads 1-1/16" thick for standard stairs

the stair glass company

Stingers

One of the most important elements in the construction of a staircase is the steel stringer that supports the entire structure. The central steel double stair stringer ensures better stability while adapting to all staircase styles, but is mainly used for straight and half-turned staircases.

bottom of page